2015 BMW M4
Low Mileage
Stock# 57337 Austin, TX
$40,989
+ Taxes & Fees
Mileage58,467
EngineV6 3L
Transmission6-Speed Manual
FuelGasoline
Specifications
- Body Style2D Coupe / Coupe
- Year2015
- MakeBMW
- ModelM4
- TrimExecutive
- Drive TrainRWD
- Exterior ColorMineral White Metallic
- Interior ColorBlack
- Doors2
- VINWBS3R9C50FK329186
Description
Mineral White Metallic 2015 BMW M4 Executive w/ 6-Speed Manual RWD 6-Speed Manual 3.0L I6 REARVIEW CAMERA, LEATHER, FREE 90 DAY/3000 MILE POWERTRAIN WARRANTY, NO HIDDEN DEALER FEE'S, Aftermarket Carbon Fiber Front Splitter and rear diffuser, BMW M Performance cat back exhaust, YES!!! THIS VEHICLE IS EQUIPPED WITH A 6 speed MANUAL Transmission, Carbon Fiber Roof, Full Merino Leather Seating, Recently serviced with FOUR BRAND NEW TIRES!!!, ABS brakes, Comfort Access Keyless Entry, DVD-Audio, Electronic Stability Control, Emergency communication system, Executive Package, Front dual zone A/C, Harman/Kardon Surround Sound System, Head-Up Display, Heated door mirrors, Heated Front Sport Seats, Heated Steering Wheel, High intensity discharge headlights: Bi-xenon, Illuminated entry, Low tire pressure warning, Navigation System, Park Distance Control, Rear-View Camera, Remote keyless entry, Retractable Headlight Washers, Traction control, Wheels: 19" x 9" Front/19" x 10" Rear Light Alloy.BEWARE OF OTHER DEALER'S "HIDDEN" FEES AND ADDENDUMS!!! APPLE SPORT IMPORTS HAS NO DEALER FEES OR ADDENDUMS ON ANY VEHICLES! Recent Arrival! Clean CARFAX. Odometer is 13415 miles below market average! 17/26 City/Highway MPGReviews: * Impressively powerful turbocharged engine; sharp and responsive handling; stout brakes; agreeable ride quality; roomy and solidly built interior. Source: Edmunds * If you crave the excellent handling and power of the 3 Series sedan in coupe or convertible form, look to the 2015 BMW 4 Series. The new 4-door Gran Coupe is the only 4 Series with room for five, and is able to carry cargo easier, thanks to its wide-opening liftgate. Source: [url] Apple Sport Imports our Smart Price means you won't pay more but you will certainly get more! Unfortunately, this vehicle does NOT qualify for our lifetime power train warranty. 3 month or 3000 mile limited power train warranty provided at no additional cost. Free Saturday Car Washes. CALL AHEAD to verify availability! OUR INVENTORY CHANGES HOURLY! Our professional, experienced sales staff has been trained specifically to make your buying experience as enjoyable and hassle-free as possible. Check out our reviews on GOOGLE and [url] While every effort has been made to ensure display of accurate data, the vehicle listings within this web site may not reflect accurate vehicle descriptions. Please confirm vehicle options, pricing and availability with Apple Sport Imports prior to purchase.
Features & Options
Technology & Entertainment
Navigation System
9 Speakers
AM/FM radio
DVD-Audio
Radio data system
Radio: AM/FM Audio System
Steering wheel mounted audio controls
Rear-View Camera
REARVIEW CAMERA
Comfort & Convenience
Executive Package
Comfort Access Keyless Entry
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Speed-sensing steering
Retractable Headlight Washers
Heated door mirrors
Power door mirrors
Heated Steering Wheel
Illuminated entry
Leather Shift Knob
Leather steering wheel
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Heated Front Sport Seats
Power passenger seat
Split folding rear seat
LEATHER
FREE 90 DAY/3000 MILE POWERTRAIN WARRANTY
BMW M Performance cat back exhaust
Full Merino Leather Seating
Other Features
CD player
Harman/Kardon Surround Sound System
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear air conditioning
Rear window defroster
Head-Up Display
Emergency communication system
Front anti-roll bar
Rear anti-roll bar
Speed control
Bumpers: body-color
Driver door bin
Front reading lights
Garage door transmitter
Outside temperature display
Park Distance Control
Rear reading lights
Trip computer
Front Center Armrest
Passenger door bin
NO HIDDEN DEALER FEE'S
Aftermarket Carbon Fiber Front Splitter and rear diffuser
YES!!! THIS VEHICLE IS EQUIPPED WITH A 6 speed MANUAL Transmission
Exterior & Mechanical
Four wheel independent suspension
Low tire pressure warning
Delay-off headlights
Fully automatic headlights
High intensity discharge headlights: Bi-xenon
Auto-dimming door mirrors
Turn signal indicator mirrors
Auto-dimming Rear-View mirror
Driver vanity mirror
Passenger vanity mirror
Wheels: 19" x 9" Front/19" x 10" Rear Light Alloy
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
Carbon Fiber Roof
Recently serviced with FOUR BRAND NEW TIRES!!!
Safety & Security
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Knee airbag
Occupant sensing airbag
Overhead airbag
Brake assist
Electronic Stability Control
Panic alarm
Security system































